Summary
IRP Volume 29 is available for industry review. The document defines temporary pipework, provides minimum standards for its selection, implementation of use and more.
IRP Volume 29 is available for industry review. The document defines temporary pipework, provides minimum standards for its selection, implementation of use and more.
September 22, 2025
Temporary pipework is mobilized to various well operations and subjected to dynamic conditions, pressure changes and other stresses during storage, transport and operation.
There is no single temporary pipework design standard and regulatory requirements vary across western Canadian jurisdictions, which creates the potential for failure. For example, connections may be compatible but may be designed to operate at different working pressures than other components of the system. Some jurisdictions mandate the use of engineered restraint systems to secure temporary flow piping at worksites.
This Industry Recommended Practice provides a risk-based approach to enhance safety when using a temporary pipework system. The IRP outlines the design, assembly, and potential failure contributors as factors to consider during a site-specific risk assessment for the use of temporary pipework.
The audience includes those involved in the planning, set up and use of temporary pipework. This applies to drilling, completions, workovers, well servicing and decommissioning operations.
Your input helps make sure this Industry Recommended Practice reflects real work in the field. Here’s how you can take part:
Download the Industry Recommended Practice (IRP) and take a look at the current version.
Have a comment or suggestion? Use the feedback form to tell us what works, what doesn’t, or what could be improved.
Read previously submitted feedback and see how the committee has responded.
Review background materials and supporting documents related to this IRP